Jessore Substation
Procuring Entity Details:Reverie Power & Automation Engineering Ltd
Name of the Contract:33/11kV Sub-Station including Civil Works with land development and other related works Under BREB at Chowwgacha 03 (Solua)
Scope of the Work:
  1. Construction of Approach and Internal Road
  2. Foundation for 10/14MVA Transformer
  3. Surface Drain.
  4. Switchyard Surface Finishing
  5. Switchyard Drainage system
  6. Switchyard Fencing
  7. Foundation for 33kV Gantry and Equipment Structures
  8. Construction of Boundary Wall with Barbede Wire
  9. Cable trenchs for power and control cable as required for complete Substation.
  10. Guard post building
  11. Blast Wall
  12. Construction of 2-storied control building with 3 storied foundation including Chile-Kotha along with the facilities for electricity, water supply, sewerage
Contact Reference & Date:WO No : #  261157200011  WO Date : 2026-01-14
Project LocationSolua, Chougacha,  Jessore
Progress of Work:Ongoing
Start Date

Completion Date

:

19-01-2026

 

Total Land Area:17398.39 Sft

Project Progress

Project Start Completed
0% 27%